ERECTION OF CARBON BURN-OUT BOILER PLANT The Carbon Burn Out boiler utilises fly ash and bed ash deposits from existing operating boilers as a fuel to generate steam and deposits with reduced carbon content. The project included the construction of a fluidized bed Thermax boiler of capacity 16.2 TPH, and pressure 16 bars. List of [...]
Boiler Relocation Project
The Medine Sugar Factory upgraded its existing capacity of electricity generation with the addition of a 70 kW John Thompson boiler transferred from Union St Aubin Sugar Factory. The boiler and its associated equipment, piping, pressure parts, impulse line and ducting were dismantled, refurbished, installed and commissioned during a ten months period.
Black Bear Resources Indonesia
Dismantle, transfer of Nitric Acid Plant (MCFI) to Indonesia
Shell International
LPG Vessels - Supply and Erection
Mauritius Molasses Co. Ltd
Conversion of tank no. 3 into petroleum class B products storage tank with associated civil and mechanical works
CIE Thermique du Sud (CTDS)
EPC Turnkey Project for Coal Powerplant at Union St Aubin (35 MW)