The Medine Sugar Factory upgraded its existing capacity of electricity generation with the addition of a 70 kW John Thompson boiler transferred from Union St Aubin Sugar Factory. The boiler and its associated equipment, piping, pressure parts, impulse line and ducting were dismantled, refurbished, installed and commissioned during a ten months period.