ERECTION OF CARBON BURN-OUT BOILER PLANT The Carbon Burn Out boiler utilises fly ash and bed ash deposits from existing operating boilers as a fuel to generate steam and deposits with reduced carbon content. The project included the construction of a fluidized bed Thermax boiler of capacity 16.2 TPH, and pressure 16 bars. List of [...]
Boiler Relocation Project
The Medine Sugar Factory upgraded its existing capacity of electricity generation with the addition of a 70 kW John Thompson boiler transferred from Union St Aubin Sugar Factory. The boiler and its associated equipment, piping, pressure parts, impulse line and ducting were dismantled, refurbished, installed and commissioned during a ten months period.
Omnicane-Savannah
Dismantle Oliver Filter press unit & accessories & erect same back
BWSC
FABRICATE TANKS FOR FORT VICTORIA POWER STATION The works consisted of a supply, fabrication and erection of 10 non pressurized tanks for HFO storage, ranging from 3 x 10m3, 1 x 16m3, 4 x 25m3, 2 x 30 m3. The tanks consisted of 5mm thick mild steel plates. They were also grit blasted and painted. [...]