ERECTION OF CARBON BURN-OUT BOILER PLANT The Carbon Burn Out boiler utilises fly ash and bed ash deposits from existing operating boilers as a fuel to generate steam and deposits with reduced carbon content. The project included the construction of a fluidized bed Thermax boiler of capacity 16.2 TPH, and pressure 16 bars. List of [...]
Boiler Relocation Project
The Medine Sugar Factory upgraded its existing capacity of electricity generation with the addition of a 70 kW John Thompson boiler transferred from Union St Aubin Sugar Factory. The boiler and its associated equipment, piping, pressure parts, impulse line and ducting were dismantled, refurbished, installed and commissioned during a ten months period.
Manser Saxon
INTERVENTION AT MIDLAND DAM The works consisted of the Replacement of a DN 1800 butterfly valve. This has been achieved after dismantling of steel platforms and removal of associated pipe spool piece. Moreover, a stop-log was installed inside the dam after removal of the bottom trash rack to prevent water ingress in the valve chamber
Terragen Ltd
Work on Grid TR1
Fuel Refinery Ltd
Refurbish & Installation of Vacuum Pan
Omnicane-Savannah
Dismantle Oliver Filter press unit & accessories & erect same back
Total Mauritius Ltd
Refurbish Three Existing Hydrant Pit Boxes & Valves and Relocate Existing Equipment in a New Inspection Chamber at SSRIA