ERECTION OF CARBON BURN-OUT BOILER PLANT The Carbon Burn Out boiler utilises fly ash and bed ash deposits from existing operating boilers as a fuel to generate steam and deposits with reduced carbon content. The project included the construction of a fluidized bed Thermax boiler of capacity 16.2 TPH, and pressure 16 bars. List of [...]
Sotratech Limited
FSM-Civil Works, Chimney, Shed, Pipings
Centrale Thermique de Belle Vue
Erection of 2 x 140 TPH Boilers Erection of Coal/Bagasse Handling 900 tons. Manufacture of 2 x ESP and 2 x G Collectors
Consolidated Energy Ltd (CEL)
EPC Contractor - Dismantling and Erection Co-generation Power Plant - Coal & Bagasse (30 MW)