Supply, Fabricate and Erection of 1 Tank (100m3)
BWSC
FABRICATE TANKS FOR FORT VICTORIA POWER STATION The works consisted of a supply, fabrication and erection of 10 non pressurized tanks for HFO storage, ranging from 3 x 10m3, 1 x 16m3, 4 x 25m3, 2 x 30 m3. The tanks consisted of 5mm thick mild steel plates. They were also grit blasted and painted. [...]
Omnicane Milling Operations
Re-align & level gantry beams
Mon Loisir
Boiler Repairs, stubs to manifolds, plugs to main bank tubes
Mon Loisir
Supply of 40 off swaged tubes
Mon Loisir
Massecuite Reheater Unit – Replace finned tubes