Project Description

ERECTION OF CARBON BURN-OUT BOILER PLANT

The Carbon Burn Out boiler utilises fly ash and bed ash deposits from existing operating boilers as a fuel to generate steam and deposits with reduced carbon content. The project included the construction of a fluidized bed Thermax boiler of capacity 16.2 TPH, and pressure 16 bars.

List of major works erected consisted of the following:

Combustor with its associated structural steel, steam drum assembly, pressure parts including integral piping, economiser coils & assembly with casing, evaporator coils, cyclone arrangement, bunkers, rotary equipments, refractory works, fly ash bag filter, smoke stack, ash dryer & ash bulk handling equipment, lagging and cladding.